天天天天香蕉线视频国产_日韩美女少妇免费观看_久久久噜嚕噜久久久_无码A级免费黄色视频

CONTACT US

13770259688

Dongtai Fu De Machinery Co., Ltd.
Address:No. 16 Zhenxing Road, Dongtai Development Zone
Mobile:+86.013770259688
Website:www.naga805.com
Email:ldyc@sina.com
Corporate news

Your current location:Home > Corporate news

  • Application and maintenance of pile hammer(2)
  • 2018/3/19 Times of reading:[1206]
  • The effect of lower piston and molybdenum - lipid disulfide

    The pile hammer produces a lot of heat when used. To ensure the normal operation of the pile hammer, the upper piston must be lubricated manually by adding molybdenum lithium sulfide to the lower piston every one hour according to the requirements of the product specification, in addition to the forced lubrication of the upper piston by the oil pump.

    The functions of adding molybdenum-lithium bisulfide are as follows:

    1. Reduce the friction between lower cylinder and upper piston;

    2. Improve the sealing performance of piston and cylinder;

    3. It can play the role of heat dissipation.

    If we stick to the above three points, we can effectively extend the life of pile hammer.

Copyright:Dongtai Fu De Machinery Co., Ltd. Telephone:+86.013770259688 Record number:Su ICP 18011909. Technical support:Sike Network
Telephone:+86.0515-88102095 Website:www.fdmachine.com Email:ldyc@sina.com Address:No. 16 Zhenxing Road, Dongtai Development Zone
Disclaimer: Part of the content of this website is from the Internet, if it unintentionally involves third-party intellectual property rights, please call or write to inform, this site will be timely response and improvement.